ARC Tunnel THE CM Consortium

amtrak-acela

Access to the Region’s Core (ARC) Trans-Hudson Express (THE) Tunnel Construction

PACOTECH™ as part of a joint venture known as “THE CM Consortium of Newark”, provided Construction Management support services for the construction of the Trans-Hudson Express (THE) Tunnel. Services included design oversight, independent cost estimates to validate those made by the engineering team; development of a master project schedule for the engineering, permitting, construction phase CEI services; and Quality Controls.

THE ARC Tunnel project featured a new two-cavern, eight-track passenger station 120 feet under 34th Street in Manhattan between 6th and 8th Avenues, adjacent and connecting to the existing Pennsylvania Station; two new bored tunnels under the Hudson River between New York and New Jersey, and bored and sequential excavation tunnels in Manhattan; and track expansion, connections and train storage facilities in the Meadowlands located in East Rutherford, New Jersey.

Agency / Owner:
New Jersey Transit & Port Authority of New York & New Jersey
New York, NY

Client:
THE CM Consortium, tri-venture between Tishman, Parsons Transportation, and Arup

Project Value:
$7.2 Billion

Contract Value:
$1.1 Million

Project Period:
2006 – 2010

Contact/Reference:
Gareth C. Middleton, PE
Sr. Vice President – Transportation & Infrastructure
Tishman Construction
Tel: 973-643-4007

Services Provided:
Cost Estimating
Value Engineering
Document Control
Cost Engineering
Construction Inspection

No Comments